Payment Terms: T/T
Delivery Time: 30 working days
Export Country: Philippines
Transaction Terms and Port of Destination: CIF Cebu
Shipping Method: Air Freight + Sea Freight
Product Name: BZ Type Pillar Jib Crane
Lifting Capacity: 2t
Arm Length: 6m
Lifting Height: 2.25+6.815m
Lifting Capacity: 3t
Arm Length: 6m
Lifting Height: 3.085+2.915m
Quantity: 2 units
This customer first worked with us in 2024, purchasing a jib crane for equipment maintenance work. After the project was completed, the customer expressed high satisfaction with the crane quality and our after-sales service, laying a solid foundation for future cooperation.
In 2025, the customer contacted SEVENCRANE again with a new requirement. As a trading company, he was sourcing lifting equipment for his end user, who needed two manual pillar jib cranes for maintenance operations at a local port. The required capacities were 2 tons and 3 tons respectively. Since the working environment involved outdoor maintenance and limited power availability, manual operation was considered the most practical and economical solution.
At the time of the inquiry, our sales team was attending the Canton Fair. Although there was a slight delay in replying, we immediately prepared detailed quotations and technical documents as soon as we returned to the office. Thanks to our previous cooperation, the customer had complete confidence in product quality and service, so communication throughout the project remained smooth and efficient.
As the customer was acting on behalf of the end user, the purchasing decision required several rounds of internal discussions. Therefore, the project progressed slowly, and it was not until the beginning of 2026 that the customer informed us that the order was moving forward.
During the final stage, the end user requested customized anchor bolt dimensions to match the existing installation conditions at the port. Our engineering team quickly evaluated the requirement and provided a tailored solution. The flexibility of our design and our prompt response further strengthened the customer’s confidence.
With proven product quality, professional technical support, and a trusted partnership built over years of cooperation, the order for one 2-ton and one 3-ton manual jib crane was successfully confirmed. The customer once again chose SEVENCRANE as a reliable lifting equipment supplier and looks forward to expanding cooperation on future projects.
A pillar jib crane is a versatile lifting device widely used in workshops, warehouses, ports, and maintenance areas. Its compact structure and 360-degree rotation capability make it ideal for efficient material handling. A typical pillar jib crane consists of the following key components:
The support pillar is the main vertical structure of the crane and serves as the foundation for the entire system. It is manufactured from high-strength steel to provide excellent rigidity and stability. The pillar supports the boom arm and allows it to rotate smoothly during operation.
The boom arm, also called the jib arm, is the horizontal beam extending from the support pillar. It carries the hoist and trolley and provides the working radius of the pillar jib crane. Depending on the application, the boom can rotate up to 360 degrees, enabling operators to cover a large working area with minimal effort.
The hoist is the lifting mechanism responsible for raising and lowering loads. According to different lifting requirements, a pillar jib crane can be equipped with a manual chain hoist, electric chain hoist, or wire rope hoist. The choice depends on the load capacity, lifting frequency, and working environment.
Mounted on the boom arm, the trolley allows the hoist to travel horizontally along the beam. This movement enables accurate load positioning and improves handling efficiency. Manual and motorized trolley options are available depending on operational needs.
For pillar jib cranes, the mounting system mainly consists of a heavy-duty base plate and anchor bolts. The base plate is welded to the support pillar and securely fixed to the concrete foundation using anchor bolts. This structure ensures the stability and safety of the crane during lifting operations. Proper foundation design and anchor bolt installation are essential for reliable long-term performance.
Together, these components form a robust and efficient lifting solution capable of meeting various material handling requirements across different industries.